#STANDWITHUKRAINE

Today, December 22, 2022, at 07:00 a.m., the ninth power unit of domestic nuclear power plants was connected to the power grid, which was taken out for repair on December 18 to remedy flaws. The capacity is being ramped up

Thus, all nuclear units on the Ukraine-controlled territory are in operation.

Currently, the ninth unit is loaded to 400 MW. After Ukrenergo lifts the restrictions on the output of power at this energy hub, it will be loaded up to a nominal capacity of 1,000 MW – and Ukraine will receive the full power of all NPP power units located on the territory controlled by the state.