As a result, Zaporizhzhya NPP was completely de-energized. Diesel generators started automatically. The available supplies of diesel fuel for their operation in such mode will be enough for 10 days.
Repair and restoring the lines linking the ZNPP with the power system are required.
Plans to connect power units to the grid in conditions of shelling and damage to all lines are unrealistic.